Haier HCH2100ACS Owner's Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 68
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
5
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation. Read and follow the
instructions provided with any tools listed here.
Tools needed
Level
Drill with 1¼", ¹⁄₈", and ⁵⁄₁₆" Drill Bits
Pencil
Wire Stripper or Utility Knife
Tape Measure or Ruler
Pliers
Caulking Gun
Caulking Compound (weatherproof)
Vent Clamps
Jigsaw or Keyhole Saw
Flat-blade Screwdriver
Metal Snips
Phillips Screwdriver
Metric Hex Key Set
For non-vented (recirculating) installations, you will also need:
6" (15.2 cm) dia. round metal vent duct - length required is determined by ceiling
height.
Parts supplied
Remove parts from packages. Check that all parts are included.
120 V Power Cord (with 3 prong plug)
Hood Canopy Assembly (blower, vent
transition, light bulb and canopy glass
[pre-installed])
Metal Grease Filter
Vent Cover Support Bracket
(attached to vent cover)
Two-Piece Vent Cover
4 x 8 Screws (4)
5 x 45 mm Mounting Screws (6)
8 x 40 Wall Anchors (2)
10 x 50 mm Wall Anchors (4)
LOCATION REQUIREMENTS
IMPORTANT: Observe all governing codes and ordinances.
Have a qualied technician install the range hood. It is the installer’s responsibility to
comply with installation clearances specied on the model/serial rating plate. The
model/serial rating plate is located behind the left lter on the rear wall of the vent
hood.
Canopy hood location should be away from strong draft areas, such as windows,
doors and strong heating vents.
Grounded electrical outlet is required. See “Electrical Requirements” section.
Page view 6
1 2 3 4 5 6 7 8 ... 68

Comments to this Manuals

No comments