Haier HPU-42CF03 User Manual Page 24

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 23
22
Installation procedures
Installation of indoor unit
Selection of installation place
Place where it is easy to route drainage pipe and outdoor piping.
Place away from heat source and with less direct sunlight.
Place where cool and warm air could be delivered evenly to every corner of the room.
Place near power supply socket. Leave enough space around the unit (refer to installation
drawings).
Fixing of the unit
Position of the wall hole
Wall hole should be decided according to installtion place and piping direction. (refer
to installation drawings)
Making a wall hole
Drill a hole of 70mm dia. with a little slope towards outside.
Install piping hole cover and seal it with putty after installation.
1.
2.
Fixing of indoor unit
To prevent it from fall off, please fix the unit with fall-prevention fitting at wall and
L-shaped metal at floor.
INDOOR SIDE
OUTDOOR SIDE
wall hole
wall thickness
( Cross section of wall hole )
70mm
Self-tapping
screw
all-prevention fitting metal
Wood screw
L-shaped metal
Please install the whole unit
horizontally,with a slop of 1 degree at
front and rear,left and right.
Page view 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29

Comments to this Manuals

No comments