Haier ESA412K User Manual Page 70

  • Download
  • Add to my manuals
  • Print
  • Page
    / 259
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 69
(2) Check if water drainage is smooth after installation.
Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage.
After wiring
Remove cover of control box, connect 1PH power to terminal 1 and 2 on terminal block.,use remote
controller to operate the unit.
Note, in this operation, fan will be running.
Upon confirmation of a smooth water drainage, be sure to cut off power supply.
Check water drainage in cooling operation.
Method of water charging
Charge water from
air outlet
Charge water from
inspecting hole
Watering can of plastic
pipe should be about
100 mm long
100mm
Water drainage port for
maintenance
(Drain water from
this hole)
Self-provided stiff pipe
Maintenance
Inspecting hole
1 2 3 D
When wiring is not complete
Cover of controll box
PCB on
indoor unit
Terminal block
Connect with
outdoor unit
Terminal block
>a__WcU[S^ <[c >a`V[e[a`Wc
For series 242, 282, 362, 482, 602
INM?IIK NHDM
M@KGDH<F =FI>E
DH?IIK NHDM
M@KGDH<F =FI>E
JIP@K LNJJFQ9
481.511O-4Hj-61Ci
KL M
H234
234
Q0B
Q0B
Q0B
234
2JC-331.341Oj-61Ci
JIP@KLNJJFQ9
DH?IIK NHDM
M@KGDH<F =FI>E
FH
234
Q0B
+A_a bVaZVb 473- 583- 713 ,
+A_a bVaZVb 353- 383-473 R^U <=283<>@K< ,
-70-
Page view 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 258 259

Comments to this Manuals

No comments